Project Highlight At a prominent confectionery site in York, Newsome has installed a high-capacity 400 kW chiller, marking the successful realisation of the project. Designed to reinforce ESG targets, the installation boosts process efficiency while lowering overall power consumption and CO₂ levels. https://bookmarkjourney.com/story20730271/energy-efficient-400-kw-chiller-installation-delivers-50-000-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-reduction