To begin with, the Jai Hind metro station was prepared to be elevated. However, the AAI objected that the elevated stretch up towards the airport could possibly pose a risk to plane, And so the route was additional reworked and also the station was shifted underground, one hundred fifty m within https://chandrag047cor1.blogscribble.com/profile