At first, the Jai Hind metro station was prepared to be elevated. On the other hand, the AAI objected that the elevated stretch up towards the airport could pose a risk to plane, Therefore the route was even more reworked and also the station was shifted underground, 150 m through the https://railwaykolkata45666.prublogger.com/31521183/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf